Places you will find us
Discover the secret of optimised buildings
Explore our case studies
Featured Projects
Whatever the challenge, our open information systems and building optimisation platforms and products have help buildings across the globe achieve operational efficiency and increased ROI. Take a look for yourself.
Sydney Central
Condenser Water Optimization
Charles Sturt University
Energy Performance Contract
Hawaii Energy System
Chiller Optimization
Hilton Plaza
Energy Conservation Measures
Optergy projects
We empower businesses across different industries to take back full control
- All
- Residential
- Retail
- Precinct
- Education
- Leisure
- Government
- Military & Defence
- Healthcare
- Critical Environments
- Commercial
- NABERS
Westpac Building Concord
Read Moreibis Brisbane Airport
This project involves construction of the 5-star Pullman Brisbane Airport Hotel, 3.5-star Ibis Brisbane Airport Hotel and the Brisbane Airport Conference Centre. The Pullman Hotel will be Brisbane’s first 5-star hotel in over a decade. This development will be the airport’s biggest third party development with Optergy Enterprise driving the development.
Sky One Luxury Landmark Apartments (545 Station Street Box Hill)
A 36 story mixed-use building with destination retail and luxury apartment base building equipment controlled by BMS. We delivered D&C solution on our BMS and EMS for Sky One Luxury Landmark Apartment Building located in Box Hill. The work involved the design and construct BMS work to control of base building equipment, retail building equipment, and also monitoring energy consumption of the entire building.
Stirling Cross, Lot 222
The three apartment tower blocks will be monitored and controlled via the new Proton supervisory system controls strategy for base build control functions.
Wrap Apartments Southbank
Wagga Wagga Marketplace
Wagga Wagga Marketplace was expanding to house 40 more shop fit outs and receive a full air-conditioning makeover. This project is a complete redevelopment of an old shopping centre and involves replacing all of the AHUs, boilers, chillers and fans. Our system integrator was contracted to provide controls on 2 new boilers and Chillers, 4 multi-zone and 11 single zone roof mounted AHUs. These would replace the multiple existing systems controlling multiple ageing package units which were in disrepair and no longer capable of handling the heating and cooling loads in the building. The existing system was replaced with an Optergy Enterprise system for energy management.
Water Gardens Town Centre
Contracted to Entire Air-conditioning, Watergardens Redevelopment Works spans to revamp and extend the Stage 1 Mall Area to New Food Courts and retail outlets to this Town Precint Centre. This project aimed to have a short completion time frame of less than 6 months.
Summerhill Shopping Centre
St Michael’s Grammar School, Commons Building
Strathcona College
Simonds Stadium
St Kilda Family And Children’s Centre
State Coroners Office
South East Water Frankston
RAAF Base East Sale Redevelopment
Read MoreWebb Dock West Building
Wagga Wagga Base Hospital
Whyalla hospital Cancer Centre
Stanlake Private Hospital
Uniting Age Well Hawthorn Retirement Living Apartments
Warringal Hospital
Sullivan Nicolaides Pathology
Vision Eye Institute
Toll Mars Warehouse Facility, Altona North
Rundle Place
Various systems integrated under Optergy head-end.